Home
Projects
Project Calender
Tile Wreck
"Wreck Two" in Monte Cristi Bay
"Wreck One" in Monte Crisiti Bay
Le Casimir 1829
Le Dragon 1783
Florida - ADMAT's Button Wreck Project 2005
St. Kitts
The Island Wreck in Monte Cristi Bay
Student Homework
Application Process And Required Documentation
Services
Archaeological Services
News
President's Message
News! Read all about it here first
ADMAT Newsletters
"News Form The Deep" Archive
Press Archives
The ADMAT Le Dragon July 2018 Blog
About
ADMAT's Mission Statement
Contact
Mailing List
ADMAT France
ADMAT Team
Our Sponsors

A.D.M.A.T

Home
Projects
Project Calender
Tile Wreck
"Wreck Two" in Monte Cristi Bay
"Wreck One" in Monte Crisiti Bay
Le Casimir 1829
Le Dragon 1783
Florida - ADMAT's Button Wreck Project 2005
St. Kitts
The Island Wreck in Monte Cristi Bay
Student Homework
Application Process And Required Documentation
Services
Archaeological Services
News
President's Message
News! Read all about it here first
ADMAT Newsletters
"News Form The Deep" Archive
Press Archives
The ADMAT Le Dragon July 2018 Blog
About
ADMAT's Mission Statement
Contact
Mailing List
ADMAT France
ADMAT Team
Our Sponsors
 Raimund and Connor recover the anchor which was tangled arround the barrel hoops so that it can be returned to a fisherman

Raimund and Connor recover the anchor which was tangled arround the barrel hoops so that it can be returned to a fisherman

 Lt. Ventura from ONPCS who was part of the team for the whole month and was a great help all round

Lt. Ventura from ONPCS who was part of the team for the whole month and was a great help all round

 Looking down at a hole in hull on the starboard side. Copper sheeting can be clearly seen where it has separated from the hull planking

Looking down at a hole in hull on the starboard side. Copper sheeting can be clearly seen where it has separated from the hull planking

 Floors and futtocks before a light dusting

Floors and futtocks before a light dusting

 The larger frames are floors

The larger frames are floors

 The smaller ones, slightly thinner are futtocks

The smaller ones, slightly thinner are futtocks

 As we move down the starboard amidships section it becomes a bit confusing due to the hull repairs

As we move down the starboard amidships section it becomes a bit confusing due to the hull repairs

 Here you can clearly see the hull planking with the floor, futtock, floor configuration with the ceiling planking on top

Here you can clearly see the hull planking with the floor, futtock, floor configuration with the ceiling planking on top

 The tape measure was placed on top

The tape measure was placed on top

 The work damage can be clearly seen at the ends of the floors and futtocks, as the worms eaten away through the timber which was American white oak according to the archives

The work damage can be clearly seen at the ends of the floors and futtocks, as the worms eaten away through the timber which was American white oak according to the archives

 Another double frame, this one looks like a floor and futtock next to each other, or a strengthening to the floor under the repairs

Another double frame, this one looks like a floor and futtock next to each other, or a strengthening to the floor under the repairs

 The sand is slowly uncovered to reveal the ends of the timbers

The sand is slowly uncovered to reveal the ends of the timbers

 To be hand fanned

To be hand fanned

 Interestingly there was the remains of a metal strap which was wrapped arround the side of the floor to act as a strengthing. This was also seen on the port side during the 2000 survey

Interestingly there was the remains of a metal strap which was wrapped arround the side of the floor to act as a strengthing. This was also seen on the port side during the 2000 survey

 The white calcareous tubes from the works can be seen protruding from the ends of the timbers

The white calcareous tubes from the works can be seen protruding from the ends of the timbers

 Another double frame, but the join is difficult to see due to the worm damage

Another double frame, but the join is difficult to see due to the worm damage

 A round blue flint on top of the ceiling planking which was used for the flintlock

A round blue flint on top of the ceiling planking which was used for the flintlock

 A possible repair due to the small gap between the frames which does not match the others as it is too small to be the normal and too large for a deliberate double frame

A possible repair due to the small gap between the frames which does not match the others as it is too small to be the normal and too large for a deliberate double frame

 The end of the exposed floors and futtocks on the starboard side

The end of the exposed floors and futtocks on the starboard side

 The floors and futtocks after cleaning and tagging

The floors and futtocks after cleaning and tagging

 The next section, clearly showing the ceiling planking

The next section, clearly showing the ceiling planking

 And the next section

And the next section

 Double frame 31 & 30

Double frame 31 & 30

 Frames 33 & 32 on the starboard side

Frames 33 & 32 on the starboard side

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Previous Next
 Raimund and Connor recover the anchor which was tangled arround the barrel hoops so that it can be returned to a fisherman
 Lt. Ventura from ONPCS who was part of the team for the whole month and was a great help all round
 Looking down at a hole in hull on the starboard side. Copper sheeting can be clearly seen where it has separated from the hull planking
 Floors and futtocks before a light dusting
 The larger frames are floors
 The smaller ones, slightly thinner are futtocks
 As we move down the starboard amidships section it becomes a bit confusing due to the hull repairs
 Here you can clearly see the hull planking with the floor, futtock, floor configuration with the ceiling planking on top
 The tape measure was placed on top
 The work damage can be clearly seen at the ends of the floors and futtocks, as the worms eaten away through the timber which was American white oak according to the archives
 Another double frame, this one looks like a floor and futtock next to each other, or a strengthening to the floor under the repairs
 The sand is slowly uncovered to reveal the ends of the timbers
 To be hand fanned
 Interestingly there was the remains of a metal strap which was wrapped arround the side of the floor to act as a strengthing. This was also seen on the port side during the 2000 survey
 The white calcareous tubes from the works can be seen protruding from the ends of the timbers
 Another double frame, but the join is difficult to see due to the worm damage
 A round blue flint on top of the ceiling planking which was used for the flintlock
 A possible repair due to the small gap between the frames which does not match the others as it is too small to be the normal and too large for a deliberate double frame
 The end of the exposed floors and futtocks on the starboard side
 The floors and futtocks after cleaning and tagging
 The next section, clearly showing the ceiling planking
 And the next section
 Double frame 31 & 30
 Frames 33 & 32 on the starboard side
Back to Top

© Copyright ADMAT All rights reserved

olive jar.jpg Simoninstructs.jpg 147.jpg White House Bay Wreck, St Kitts 2.jpg Cannons4.jpg faience collection on display.jpg
LouisDrawingBoards.jpg
AquaScanCameraIsUnpacked.jpg
Buckle.jpg
press release picture st kitts.JPG
c89.jpg
beachgroup.jpg
JeremyPhotographer2a.jpg
SimonGreetSchoolKidsWelcome2B.jpg